📚 Modelling a Project | 项目建模
Project modelling is the process of turning a real-world project into a mathematical network of activities, durations, and precedence constraints. It allows decision mathematicians to calculate the shortest possible completion time, identify which activities cannot slip, and schedule resources efficiently.
项目建模是将现实项目转化为由活动、工期和前置约束组成的数学网络的过程。它使决策数学家能够计算最短完工时间、识别哪些活动不能延误,并高效地安排资源。
1. What Project Modelling Involves | 项目建模涉及什么
A project model uses three building blocks: activities, durations, and precedence relations. Activities are tasks that consume time, durations are their lengths, and precedence relations show which tasks must finish before another can start.
项目模型使用三个基本组件:活动、工期和前置关系。活动是消耗时间的任务,工期是活动长度,前置关系表示哪些任务必须在另一任务开始前完成。
The main outputs in Edexcel Decision Mathematics are the minimum project completion time, the critical path, and the float for every non-critical activity. These outputs come from a network built from a precedence table.
在爱德思决策数学中,主要输出结果是最短项目工期、关键路径以及每个非关键活动的浮动时间。这些结果来自根据前置关系表建立的网络图。
2. Precedence Tables and Immediate Predecessors | 前置关系表与紧前